289
Apartments
This premium residential offering comes with spacious studios, 1, 2,3,4 and 5-bedroom apartments in a prime location, boasting panoramic sea views. The landscaped podium offers exclusive amenities above the multi-level car parking and ground level F&B offerings.
A range of select facilities await, from state-of-the-art gymnasiums, adult and children’s swimming pools, and a thoughtfully-designed children’s play area. Savour ultra-modern facilities such as central AC and a state-of-the-art communications system while indoors with 24-hour security.
Aesthetically appealing due to its contemporary look and feel, Marassi Shores Residences exudes smart design and environmental harmony. Shaded areas allow for ambient sunlight and stimulating sea breeze, having been crafted in line with Marassi Al Bahrain’s philosophy of elegant living.
Apartments
Floors
SQM Site Area
Drive to Manama
City Centre
From the
airport
FROM KING FAHAD
Causeway
Completed
Completed
Completed
Completed
Completed
November 2019
October 2019
September 2019
August 2019
Completed
De-snagging Completed at Corridors, November 2019
Retail Area Elevation & Ext. Landscape Works, November 2019
Podium Aerial View, November 2019
Apartment - De-snagging Completed, October 2019
Main Entrance Lobby 2, October 2019
Corridor -De-snagging Completed, October 2019
Corridor -De-snagging Completed, October 2019
Elevation facing Beach, October 2019
Main Entrance Lobby, October 2019
Podium Ariel View, October 2019
Apartment Final De-snagging Completed at Level 2, September 2019
Landscaping at Podium, September 2019
Podium Finishes, September 2019
Podium Aerial View, August 2019
Pool Deck Works in progress, August 2019
Metal Fencing & Landscaping Works in progress, August 2019
Kids Play Area Works in progress, August 2019
Signage Works at Lobby, July 2019
Swimming Pool Tiling In Progress, July 2019
Podium Hard Landscape works, June 2019
Lift Door Jamb, June 2019
Vanity, Sanitary Fittings & Mirror Installation, May 2019
Wheel stopper installation works at Basement, May 2019
Gym Area Finishes, May 2019
Elevation facing the beach, May 2019
Kitchen cabinets carcass, paint first coat and MEP final fix completed, April 2019
Corridor paint first coat, MEP final fix completed, April 2019
Podium hard landscaping works, April 2019
Elevation facing the beach, April 2019
Corridor MEP final fixes, March 2019
External paint & retail facade works, March 2019
Podium hard landscaping works, March 2019
Balcony sliding doors, March 2019
Corridor Ceiling works in progress, February 2019
East Elevation, February 2019
Installation of Glass Balustrades are in progress, February 2019
North Elevation, February 2019
Final finishing in progress at the elevation to the Court Yard side, October 2018
Electrical works in progress with the installation of the distribution board taking place within apartments, October 2018
Façade works in progress at the East Elevation to the sea side with retail units, October 2018
Façade finishing in progress at the West Elevation, October 2018
Electro-mechanical works in progress at Level 1 of the car park, October 2018
Electro-mechanical works completed in the common corridors, with inspection taking place prior to the installation of the ceiling closer, September 2018
Installation of doors and windows in progress within apartments, September 2018
Preparation for façade works in progress at the East Elevation, September 2018
Electrical work – Installation of Distribution Boards in progress within apartments, September 2018
Installation of Sliding Doors towards the balconies in progress within apartments, September 2018
Floor Finishing - Tiling works in progress in units, August 2018
Façade works in progress at the Front Elevation with Retail Units, August 2018
Electro-mechanical works on the Level 5 corridor completed and ready for the ceiling to be fitted, August 2018
Structural works completed at the swimming pool deck and court yard at level 2 ready to receive finishes, August 2018
Electro-Mechanical works in progress in units, August 2018
Chillers installed at Roof level, August 2018
MARASSI SHORES RESIDENCES - Block works up to level 10 completed, level 11 in progress, July 2018
MARASSI SHORES RESIDENCES - Installation of the chillers on the roof is complete, July 2018
MARASSI SHORES RESIDENCES - Cable tray, HVAC duct, chilled water piping, water supply piping, and fire-fighting piping works in the corridors in progress, July 2018
MARASSI SHORES RESIDENCES - External plastering and painting preparation, July 2018
MARASSI SHORES RESIDENCES - Aluminum façade works in progress, July 2018
Marassi Shores Residences - Partition walls in progress, April 2018
Marassi Shores Residences – Mock-up apartment external view, April 2018
Marassi Shores Residences - Mock-up apartment, April 2018
Marassi Shores Residences – North-west elevation, April 2018
Marassi Shores Residences - East elevation – External works in progress, March 2018
Marassi Shores Residences - Basement - Electro-mechanical works in progress, March 2018
Marassi Shores Residences - Mock-up apartment – Finishing works in progress, March 2018
Marassi Shores Residences - Level 1 - Finishing works in progress, March 2018
Marassi Shores Residences - Level 2 - Blockwork and plasterwork in progress, March 2018
Marassi Shores Residences - Level 3 - Plasterwork in progress, March 2018
Marassi Shores Residences - Level 4 - Internal finishing works in progress, March 2018
Marassi Shores Residences - Level 5 - Partition walls in progress, March 2018
Marassi Shores Residences - North-west elevation - Structural works in progress at level 10, March 2018
Marassi Shores Residences - North-West Elevation- Structure up to Level 8 completed, February 2018
Marassi Shores Residences - Retail Units- Façade civil works in progress, February 2018
Marassi Shores Residences - West Elevation- Structure up to Level 8 completed, February 2018
Marassi Shores Residences - East Elevation – Structure up to Level 8 completed, February 2018
Marassi Shores Residences - Mock-up apartment – AC works in progress, February 2018
Marassi Shores Residences - Level 2- Partition walls/Block works in progress, February 2018
Marassi Shores Residences - Level 3- Partition walls/Block works in progress, February 2018
Marassi Shores Residences - Level 4 – Partition walls/Block works in progress, February 2018
Marassi Shores Residences - Mock-up apartment – Finishing in progress, February 2018
Marassi Shores Residences – West elevation – Level 7 slab being cast, January 2018
Marassi Shores Residences - West elevation - Blockwork in progress, January 2018
Marassi Shores Residences - West elevation - Blockwork in progress, January 2018
Marassi Shores Residences - Blockwork at level 2 in progress, January 2018
Marassi Shores Residences - Painting works at basement in progress, January 2018
Marassi Shores Residences - Basement mechanical works in progress, January 2018
Marassi Shores Residences - Basement painting works in progress, January 2018
Marassi Shores Residences - Level 2 blockwork in progress, January 2018
Block works in basement area, December 2017
Block works in retail area in progress, December 2017
Block works in basement area, December 2017
Level 4 completed, December 2017
Level 4 completed - west elevation, December 2017
Level 4 completed – North-West Elevation, December 2017
Retail structure completed, December 2017
Level 5 in progress, December 2017
East Elevation- Preparation for Level 3 for Marassi Shores Residences November 2017
Lift shaft preparation from level 2 to 3 for Marassi Shores Residences November 2017
West Elevation for Marassi Shores Residences November 2017
East Elevation level 3 work is in progress for Marassi Shores Residences November 2017
East Elevation for Marassi Shores Residences November 2017
Level 2 to 3 works are in progress for Marassi Shores Residences November 2017
Casting PT Slab at level 2 for Marassi Shores Residences November 2017
Preparation for PT Slabs for Marassi Shores Residences November 2017
Level 2 to 3 work is in progress for Marassi Shores Residences November 2017
Slab preparation at level 3 for Marassi Shores Residences November 2017
Level 2 slab works in progress October 2017
Retail area works in progress October 2017
Level 2 works in progress October 2017
Level 2 works in progress October 2017
Level 1 slab casting October 2017
Front elevation – level 2 works in progress October 2017
Retail area level 2 slab preparation October 2017
Zone 1 level 2 slab preparation October 2017