243
Residential
Units
Four residential buildings with 243 units offer a wide selection ranging from studios to three-bedroom apartments. Lined with 900 sqm of retail space, the boulevard faces Marassi Galleria and is within walking distance of the waterfront promenade.
With shopping, dining, and invigorating entertainment, the Boulevard offers direct access to premium dining and retail outlets and Marassi Galleria. Marassi Boulevard is located near Address Beach Resort Bahrain and Vida Beach Resort Marassi Al Bahrain, with access to a one KM stretch of white sandy beach.
Marassi Boulevard features a gym with state-of-the-art equipment, swimming pools and playgrounds with air-conditioning systems derived from sustainable architecture. Each tower features an adjoining recessed courtyard with shade trees, shrubs and groundcover. Park benches allow residents to commune with each other and their surroundings.
Residential
Units
Gross floor area
SQM Retail Area
Drive to Manama
City Centre
From the
airport
From King Fahad
Causeway
Completed
February 2020
January 2020
December 2019
November 2019
October 2019
September 2019
August 2019
Podium area and swimming pool, April 2020
Barbeque area, April 2020
Reception area Lounge, April 2020
Building C&D Front view, April 2020
Carpark at basement level, March 2020
External landscape works, March 2020
Completed
Kids Play Equipment at Podium, December 2019
GYM Equipment Installation Works, December 2019
Furniture at Building C & D Reception Area, December 2019
Wall Paper & Reception Counter works, December 2019
Access Road Works, November 2019
Wheel Stopper fixing at Basement Car-park, November 2019
MEP Testing & Commissioning Works at Building C, November 2019
De-snagging works at Building C, November 2019
Podium Waterproofing Works & Swimming Pool Tile Works, October 2019
Podium Waterproofing Works & Swimming Pool Tile Works, October 2019
Main Entrance for Building C & D, October 2019
Main Entrance for Building C & D, October 2019
Kitchen Appliances at Building C, October 2019
Fire Hose Reel Works at Basement, October 2019
Waterproofing works at Podium, September 2019
Reception Area Glazing Works at Building A, September 2019
MEP Final Fix Works at Building A, August 2019
Wash Basin fixing at Building C, August 2019
Swimming Pool Waterproofing works, August 2019
Kitchen Cabinet Works at Building B, June 2019
HVAC Grills Works at Building B, July 2019
Swimming Pool Works at Podium, June 2019
Building A Façade, June 2019
Building B - External Painting & Aluminum Window Works, May 2019
DB & Door Frame (Technical Mockup) Installation at Building C, May 2019
Roof Waterproofing Works at Building C, May 2019
Swimming Pool and Planter Box works at Podium, May 2019
Building B – Wall tile fixing for kitchen, April 2019
Swimming pool and deck concrete completed, April 2019
Building A – Aluminum windows works in progress, April 2019
Building D – Aluminum window works in progress, April 2019
Building A: Floor tiling works, March 2019
Building D: Aluminum window works, March 2019
Building D: External painting works, March 2019
Swimming pool wall & deck works, March 2019
Mockup unit - Living Room, February 2019
Ceiling Frame & Gypsum Board works, February 2019
Preparation for rendering works in progress, October 2018
Initial installation of Electro-Mechanical works in progress, October 2018
Building C - Structural works completed, with blockwork and plastering in progress, October 2018
Building A – Block works and initial installation of electro-mechanical works in progress, October 2018
Building C - Finishing works in progress at the sample apartment in, October 2018
Building A – Block works and initial installation of Electro-Mechanical works in progress, October 2018
Building C - Preparation for plastering works in progress, October 2018
Building A - laying of block works in progress, October 2018
Building D - Structural and block works completed, with internal plastering and electro-mechanical works in progress, October 2018
Building A - Block works and initial installation of electro-mechanical works in progress, October 2018
Building A - Block works and the first fix of electro-mechanical work in progress, October 2018
Decking has been set up to cast roof slabs, October 2018
Building B - Structure works completed, with block works in the final stage and internal plastering in progress, October 2018
Building A - Laying of block works in progress, October 2018
Building B - Retail units CIVIL WORKs complete, October 2018
Preparation for rendering works in progress, October 2018
Building B - Installation of electro-mechanical units in progress, October 2018
Building B- Internal Plastering works in progress, October 2018
Building B -Blockworks up to 6th Floor in Progress, September 2018
Building A -5th Floor Slab works in progress, September 2018
Building C -9th Floor Slab works in progress, September 2018
Podium Slab casting in progress, September 2018
Building D -Water supply Piping works at 1st floor in progress, September 2018
MARASSI BOULEVARD – building A, B, C & D structure works in progress, July 2018
MARASSI BOULEVARD - Block works up to level 4 in progress, July 2018
MARASSI BOULEVARD - Water supply piping works at building-B in progress, July 2018
MARASSI BOULEVARD - HVAC duct installation works at building B in progress, July 2018
MARASSI BOULEVARD - Mock-up apartment – Plastering & MEP works in progress, July 2018
Building A – Marassi Boulevard - Ground floor works in progress, April 2018
Building C – Marassi Boulevard - Level 1 works in progress, April 2018
Marassi Boulevard - View from atop, April 2018
Podium slab – Marassi Boulevard - Ground floor works in progress, April 2018